Skip to content
The Mold Removal Clive logo
Extraction and drying gear coming off the van at the curb, the first equipment onto a contaminated-water job.

24/7 Emergency

Sewage & Black Water Cleanup in Clive, IA

Category 3 black-water losses are handled with full PPE, biohazard disposal, and professional disinfection to restore safe conditions. Sewage backups are Category 3 losses: the water carries pathogens, so affected porous materials are removed rather than dried. The area is cleaned, disinfected, and dried under containment, with cut lines set above the visible contamination mark.

Quoted on site by the contractor who visits

Often needed alongside

  • Mold Remediation

    Containment, HEPA filtration, and antimicrobial treatment eliminate mold colonies at the source and prevent cross-contamination throughout the property.

A homeowner at her open door hearing what a category 3 cleanup involves before the crew brings anything in.
An independent contractor, walking the homeowner through what he found.

Frequently asked questions

Walnut Creek looks like a ditch most of the year. How does it wet a basement in June?

It is a ditch until it is not. The channel was a farm drain; subdivisions pinched the floodplain, so a June cell that used to spread across fields now has only the ditch. The rise is fast, and the first water into a house is often a downhill window well, not the front door. A quiet creek in May is not a rating of what it does with 5.39 inches in an afternoon.

The lawn is dry and the window well has water. Is that a plumbing leak?

On this loess it is often piping. Water travels along a buried contact in the silt and comes out at the well without wetting the grass. A June storm can charge that path in an hour. Check whether the well is on the downhill or creek side and whether the water is silty; silt is soil, not a supply line. Extending downspouts and sealing the well rim addresses a path the lawn will never show.

We are up the hill from the creek. Does that put us out of the June problem?

Out of overbank, not out of loess. Upland lots here were mass-graded, and fill still settles toward the foundation trench. A June storm on that reversed grade puts roof water at the wall even though the creek is a quarter mile away. The creek problem is the window well on the low streets. The hill problem is the fill. Different path, same month.

The Clive overview carries this FAQ with the city research.

Need sewage & contaminated water cleanup in Clive now?

Call (833) 243-4415
Talk to a Local Pro — (833) 243-4415